[1]
Eilzer, W., Müller, M., Schumm, M., Romberg, M., Rodríguez Molina, R. and Gutiérrez Manzanedo, F. 2022. Replacement of the cable-stayed bridges over the river Rhine in Leverkusen and Duisburg. Hormigón y Acero. 73, 297 (Aug. 2022), 23-30. DOI:https://doi.org/10.33586/hya.2020.2390.