Deck construction equipment for the Constitución de 1812 cable-stayed Bridge over the Cadiz Bay

  • Castro Rubal, J. L.; Ríos de Francisco,
Keywords: Gantry, Segment, Lifting, Welding

Abstract


The erection of the segments for the cable-stayed bridge required the use of the following pieces of deck construction equipment:- A crawler crane and a floating sheerleg, both having high load capacities.- Temporary segment support structures. They were 2 steel structures that allowed the next lift-in segment to hang up on the deck to be welded.- Self-launching deck erection gantries. Each gantry was a steel structure that lifted and placed the bridge segments while sliding along the deck.- Welding travellers. They were 4 self-launching scaffolds, which provided safe access below the deck.- Hydraulic jacking system for positioning of pier segments.
Published
2016-01-03
How to Cite
, C. R. J. L. R. de F. (2016). Deck construction equipment for the Constitución de 1812 cable-stayed Bridge over the Cadiz Bay. Hormigón Y Acero, 67(278-279). Retrieved from https://mail.e-ache.com/ojs/index.php/ache/article/view/1882